First Workday a Big Success
Roughly 30 men came out to UUAA on Saturday, June 19th to help with the community building project. Temperatures were in the mid-80s with not a cloud in the sky. What did we accomplish?
- Cleared the fire pit area
- Installed a fire ring
- Installed pea gravel and wood chips around the fire ring
- Cleaned up paths, put mulch in wet areas
- Dug about 20 post holes and installed trail markers in each.
- Cut all the wood for the benches (12 in all). Were not able to complete the project due to a glitch in the wood size. This will be corrected in the next couple of weeks.
- Prepared dinner (thanks Ken and team!)
- Had a great feast with local food and great beverage